Let’s talk ↗
PCW - Municipality & Civil

Public Container Washer.
Outdoor-grade, field-resilient.

Cleaning system for public-space containers " bus-stop bins, park containers, transit-hub waste vessels. Outdoor-grade build, dust-and-grit-tolerant hydraulics, simple operator interface. Sized for civic-Addons contractors managing public-infrastructure cleaning routes. Spec sheet finalised against your contract terms.

Equipment illustration
// section 01 - technical specifications

Specs your engineering team will ask for.

Architecture
Mobile or fixed-station - operator-loaded
Container types
Public-space bins - transit waste vessels - park containers
Throughput
30-80 containers/hr (size-dependent)
Wash pressure
80-120 kg/cm2 rotary head
Build
Outdoor-grade " IP65 - dust-and-grit-tolerant hydraulics
Effluent
On-board collection - depot disposal
Operation
Single-operator - simple HMI
Compliance
Civic contract specifications - CPCB norms
// section 02 - utility requirements

What the line needs from your plant.

Water
On-board tank
Depot-refill cycle
Effluent
On-board tank
Depot-disposal
Power
Onboard genset
Or 3-phase depot supply
Detergent
Auto-dosed
On-board concentrate
Mounting
Truck or trailer
Route-dependent
Spec sheet
Configured
Against your contract terms
// section 03 - capacity variants

Pick the variant that matches your throughput.

Variants configured against your throughput at engineering review.

// section 04 - similar machines in the catalogue

Other machines your line probably needs.

OPEX planning calculator

Estimate operating load, savings, and scope range.

Use this quick calculator for a first-pass machine scope model. Adjust site tariffs, operating hours, manual baseline, and budget assumptions before sending the RFQ.

Machine setup

Site tariffs

Scope planning estimator

Machine scope / unit-
Annual savings-
Simple payback-
Estimated project scope-
Indicative advance-

This is a planning guide only. Final proposal scope depends on layout, MOC, automation level, utilities, documentation pack, validation needs, and site scope.

// section 05 - frequently asked questions

Questions your purchase and engineering teams usually ask.

What decides the final proposal scope?

Final proposal scope depends on throughput, number of wash zones, heating method, drying, automation, documentation pack, MOC, utilities, and site installation scope.

Can the washer be sized for our existing line?

Yes. Share container dimensions, soil load, peak hourly requirement, available footprint, utilities, and audit requirements so engineering can size the machine.

What OPEX values should we use?

Use your actual electricity, water, effluent, detergent, steam, labour, and shift data. The calculator defaults are only a first-pass planning baseline.

Do you provide drawings and validation documents?

For configured enquiries, Clean Crate can provide GA drawings, utility schedules, MOC notes, control philosophy, and validation or FAT documents where required.

// request a quote

Tell us your line. We'll send back a sized system.

Share your throughput, vessel format, and plant footprint. You'll get a configured machine, GA drawing, and OPEX report " typically within five working days.

// no obligation - response within 1 business day - all enquiries handled by an engineer
Application review

Plan the application for this machine.

Review the application, trial conditions and measurement questions before preparing an RFQ.

Open application reviewAll application reviews
Translate this page
Loading languages...

Find your next step.

Search the complete Clean Crate website.