1. Start with throughput
Measure crates per hour at the bottleneck and include seasonal peaks.
Use this guide to frame throughput, wash sequence, utilities, footprint, add-ons and audit needs before requesting a proposal.
Measure crates per hour at the bottleneck and include seasonal peaks.
Milk, bakery residue, oil, chemicals and dust need different cleaning energy.
Power, water, steam/electric heating, air and drain constraints decide the practical model.
Look for pre-rinse, wash, rinse, fresh rinse and blow-off logic, not just a capacity number.
Dosing, drying, water recovery, conveyors and logging can change OPEX more than the base frame.
Temperature, dwell time, chemistry and cycle records matter when QA asks for proof.