Closed-head bung-type 200 L drum cleaning system for solvent, oil, agrochem, and pharma intermediate operations. Lance-insertion through bung opening, controlled-atmosphere wash chamber, optional ATEX zone-2 build for flammable-residue service. Nitrogen-inert option for pharma intermediates.
Drag to rotate · explore every element
Front view
Explore the machine elements, separate the parts and watch them come together. Continue below for specifications and application details.
Discuss this machine ↗Illustrative 3D reconstruction from supplied visuals. Final component layout is confirmed for your application.
| Variant | Throughput | Service | Typical fit |
|---|---|---|---|
| B2-Std | 40 drums/hr | Aqueous + solvent | Lubricant, edible oil returnables |
| B2-ATEX | 40 drums/hr | Solvent - zone-2 | Paint, agrochem, flammable solvents |
| B2-Pharma | 30 drums/hr | cGMP - N,, purge | Pharma intermediates, API service |
Use this quick calculator for a first-pass machine scope model. Adjust site tariffs, operating hours, manual baseline, and budget assumptions before sending the RFQ.
This is a planning guide only. Final proposal scope depends on layout, MOC, automation level, utilities, documentation pack, validation needs, and site scope.
Final proposal scope depends on throughput, number of wash zones, heating method, drying, automation, documentation pack, MOC, utilities, and site installation scope.
Yes. Share container dimensions, soil load, peak hourly requirement, available footprint, utilities, and audit requirements so engineering can size the machine.
Use your actual electricity, water, effluent, detergent, steam, labour, and shift data. The calculator defaults are only a first-pass planning baseline.
For configured enquiries, Clean Crate can provide GA drawings, utility schedules, MOC notes, control philosophy, and validation or FAT documents where required.
Share your throughput, vessel format, and plant footprint. You'll get a configured machine, GA drawing, and OPEX report " typically within five working days.
Review the application, trial conditions and measurement questions before preparing an RFQ.
Plan drum loading, rinsing, drainage, positioning and extraction as a connected process. The supplied concepts provide a starting point for an engineered line.
Explore solution ↗02 / EHSConsider handling and process automation where chemical residue, manual contact or open transfer creates an exposure concern.
Explore solution ↗