Open-top 200 L drum cleaning system for paint, food, lubricant, and chemical returnables. High-pressure rotary head, multi-stage detergent and rinse, drum positioning conveyor. Five throughput variants from small reconditioning to large industrial fleet operations.
Drag to rotate · explore every element
Front view
Explore the machine elements, separate the parts and watch them come together. Continue below for specifications and application details.
Discuss this machine ↗Illustrative 3D reconstruction from supplied visuals. Final component layout is confirmed for your application.
| Variant | Throughput | Typical fit |
|---|---|---|
| B1-30 | 30 drums/hr | Drum reconditioners, small co-packers |
| B1-60 | 60 drums/hr | Mid-volume chemical packers |
| B1-90 | 90 drums/hr | Paint manufacturers, lubricant fleet operations |
| B1-120 | 120 drums/hr | Large industrial fleet, multi-shift |
| B1-150 | 150 drums/hr | High-volume returnable fleet management |
Use this quick calculator for a first-pass machine scope model. Adjust site tariffs, operating hours, manual baseline, and budget assumptions before sending the RFQ.
This is a planning guide only. Final proposal scope depends on layout, MOC, automation level, utilities, documentation pack, validation needs, and site scope.
Final proposal scope depends on throughput, number of wash zones, heating method, drying, automation, documentation pack, MOC, utilities, and site installation scope.
Yes. Share container dimensions, soil load, peak hourly requirement, available footprint, utilities, and audit requirements so engineering can size the machine.
Use your actual electricity, water, effluent, detergent, steam, labour, and shift data. The calculator defaults are only a first-pass planning baseline.
For configured enquiries, Clean Crate can provide GA drawings, utility schedules, MOC notes, control philosophy, and validation or FAT documents where required.
Share your throughput, vessel format, and plant footprint. You'll get a configured machine, GA drawing, and OPEX report " typically within five working days.
Review the application, trial conditions and measurement questions before preparing an RFQ.
Plan drum loading, rinsing, drainage, positioning and extraction as a connected process. The supplied concepts provide a starting point for an engineered line.
Explore solution ↗02 / HandlingDevelop a transfer and accumulation arrangement around drum orientation, station cycle time and operator access.
Explore solution ↗