Tunnel washer purpose-built for the sticky, sugar-and-ghee chemistry of Indian sweets, bakery, and industrial confectionery. Single S1 architecture; three throughput tiers " TBW-S-300 for bakery and Western confectionery, TBW-S-600 for the halwai/mithai standard, TBW-S-1000 for industrial confectionery. Buy the tier your festival peak demands.
| Variant | Throughput | Engineering scope | Typical fit |
|---|---|---|---|
| TBW-S-300 | 200-400 trays/hr | ,113.3L base | Bakery, Western confectionery, mid-volume kitchens |
| TBW-S-600 | 400-800 trays/hr | ,125.4L base | Halwai/mithai standard, festival-surge operations |
| TBW-S-1000 | 800-1,200 trays/hr | Engineering review | Industrial confectionery, multi-shift production |
Use this quick calculator for a first-pass machine scope model. Adjust site tariffs, operating hours, manual baseline, and budget assumptions before sending the RFQ.
This is a planning guide only. Final proposal scope depends on layout, MOC, automation level, utilities, documentation pack, validation needs, and site scope.
Final proposal scope depends on throughput, number of wash zones, heating method, drying, automation, documentation pack, MOC, utilities, and site installation scope.
Yes. Share container dimensions, soil load, peak hourly requirement, available footprint, utilities, and audit requirements so engineering can size the machine.
Use your actual electricity, water, effluent, detergent, steam, labour, and shift data. The calculator defaults are only a first-pass planning baseline.
For configured enquiries, Clean Crate can provide GA drawings, utility schedules, MOC notes, control philosophy, and validation or FAT documents where required.
Share your throughput, vessel format, and plant footprint. You'll get a configured machine, GA drawing, and OPEX report " typically within five working days.
Review the application, trial conditions and measurement questions before preparing an RFQ.