Multi-stage aqueous degreasing tunnel for engine parts, machined components, fasteners, and high-volume mechanical assemblies. Conveyor-fed continuous flow, alkaline cleaner zones with overhead spray, hot rinse, optional rust-inhibitor, drying. Configurable to PPAP and IATF cycle-data requirements.
| Variant | Belt width | Throughput | Typical fit |
|---|---|---|---|
| D-600 | 600 mm | Mid-volume parts | Tier-2 automotive supplier, fastener manufacturer |
| D-900 | 900 mm | High-volume parts | Tier-1 OEM supplier, engine-component manufacturer |
| D-1200 | 1,200 mm | Bulk component flow | High-volume automotive component, mass-machined parts |
Use this quick calculator for a first-pass machine scope model. Adjust site tariffs, operating hours, manual baseline, and budget assumptions before sending the RFQ.
This is a planning guide only. Final proposal scope depends on layout, MOC, automation level, utilities, documentation pack, validation needs, and site scope.
Final proposal scope depends on throughput, number of wash zones, heating method, drying, automation, documentation pack, MOC, utilities, and site installation scope.
Yes. Share container dimensions, soil load, peak hourly requirement, available footprint, utilities, and audit requirements so engineering can size the machine.
Use your actual electricity, water, effluent, detergent, steam, labour, and shift data. The calculator defaults are only a first-pass planning baseline.
For configured enquiries, Clean Crate can provide GA drawings, utility schedules, MOC notes, control philosophy, and validation or FAT documents where required.
Share your throughput, vessel format, and plant footprint. You'll get a configured machine, GA drawing, and OPEX report " typically within five working days.
Review the application, trial conditions and measurement questions before preparing an RFQ.