Let’s talk ↗
BP - Institutional Wares - Hospital

Bedpan & Utensil Sanitiser.
Clinical cycle, closed cabinet.

Ward-level sanitisation cabinet for bedpans, urinals, and ward utensils. Closed cycle " operator loads, cabinet seals, cycle runs, decontaminated unit out. Steam-injected disinfection, validated kill against the clinical pathogen list. NABH and infection-control aligned.

Equipment illustration
// section 01 - technical specifications

Specs your engineering team will ask for.

Architecture
Closed sealed cabinet - steam-injection cycle
Cycle
Pre-rinse - clean - steam disinfect - cool
Cycle time
4-6 minutes
Disinfection
90 degC steam - validated kill spec
Vessel formats
Bedpans - urinals - ward utensils
Construction
SS 316L - sealed gasketing
Compliance
NABH - ISO 15883 disinfection cycle
Footprint
600 - 600 mm - ward-room installable
// section 02 - utility requirements

What the line needs from your plant.

Steam
15 kg/hr
Saturated, clean
Water
3 L/cycle
Softened
Power
3 kW
Single-phase 230V
Drain
DN 50
Infection-control segregated
Ventilation
Required
Steam exhaust
Loading
Front-load
Operator-load - sealed cycle
// section 03 - capacity variants

Pick the variant that matches your throughput.

Variants configured against your throughput at engineering review.

// section 04 - similar machines in the catalogue

Other machines your line probably needs.

OPEX planning calculator

Estimate operating load, savings, and scope range.

Use this quick calculator for a first-pass machine scope model. Adjust site tariffs, operating hours, manual baseline, and budget assumptions before sending the RFQ.

Machine setup

Site tariffs

Scope planning estimator

Machine scope / unit-
Annual savings-
Simple payback-
Estimated project scope-
Indicative advance-

This is a planning guide only. Final proposal scope depends on layout, MOC, automation level, utilities, documentation pack, validation needs, and site scope.

// section 05 - frequently asked questions

Questions your purchase and engineering teams usually ask.

What decides the final proposal scope?

Final proposal scope depends on throughput, number of wash zones, heating method, drying, automation, documentation pack, MOC, utilities, and site installation scope.

Can the washer be sized for our existing line?

Yes. Share container dimensions, soil load, peak hourly requirement, available footprint, utilities, and audit requirements so engineering can size the machine.

What OPEX values should we use?

Use your actual electricity, water, effluent, detergent, steam, labour, and shift data. The calculator defaults are only a first-pass planning baseline.

Do you provide drawings and validation documents?

For configured enquiries, Clean Crate can provide GA drawings, utility schedules, MOC notes, control philosophy, and validation or FAT documents where required.

// request a quote

Tell us your line. We'll send back a sized system.

Share your throughput, vessel format, and plant footprint. You'll get a configured machine, GA drawing, and OPEX report " typically within five working days.

// no obligation - response within 1 business day - all enquiries handled by an engineer
Application review

Plan the application for this machine.

Review the application, trial conditions and measurement questions before preparing an RFQ.

Open application reviewAll application reviews
Translate this page
Loading languages...

Find your next step.

Search the complete Clean Crate website.