Mobile lifting & transfer systems

Plan lifting, docking and transfer around the load and the route through your plant. A mobile concept must suit the working environment as well as the item.

Custom engineering

01 / The application

Consider the complete task.

01

Understand the lift

Specify load mass, centre of gravity, lifting interfaces and pickup/set-down heights. Assess stability across the full movement.

02

Understand the route

Review doors, gradients, floor condition, turning space and shared pedestrian areas. Identify where positioning assistance or a fixed transfer point is preferable.

03

Connect to the process

Agree the handling interface to washers, vessels, conveyors or storage. Define operator controls, charging or utilities and the maintenance approach.

02 / Process perspective

How the stages connect.

  1. 01Pick up
  2. 02Move
  3. 03Align
  4. 04Set down

Illustrative application sequence. Final stages and controls are defined for the project.

03 / Engineering inputs

Bring the details that matter.

These inputs help establish a suitable configuration, scope and acceptance criteria.

  • Load geometry and maximum mass
  • Lift height and reach
  • Floor condition, gradients and route
  • Operator access and receiving interface
Start with your process

Let’s define the whole operation.

Share the item, the workflow and the outcome you need. We’ll use them to frame the equipment and integration discussion.